29 November 2014

Best wishes for UKPCS-2012 PRE EXAM,SAMVEG IAS, DEHRADUN



Dear student
u get a chance to appear inthis exam after 3 year.so go to appear with all your energy and confidence.in new pattern donot decide in classroom that paper was easy or tough.first u should give ur best performance in both paper in exam.

may God help all of you .....

samveg ias dehradun

28 November 2014

IAS-14 MAINS ADMIT CARD OUT,EXAM ON SAME DATE.SAMVEG IAS DEHRADUN

IAS-14 MAINS ADMIT CARD OUT,EXAM ON SAME DATE.

DOWN LOAD YOUR ADMIT CARD AT


http://upsconline.nic.in/eadmitcard/upsc_ac1/csm_admitcard/

GDP in Science Research


According to the latest available statistics, the Indian investment in science and technology in terms of Gross expenditure on Research and Development (GERD) during 2011-12 has been 36.2 billion US$ Purchasing Power Parity (PPP) whereas China, the US and South Korea invested 205.4, 429.1 and 58.4 billion US$ PPP respectively. However, India’s investment is higher than many countries such as Brazil 27.4, Canada 24.7 and Sweden 13.4, Mexico 8.1and Finland 7.9 billion US$ PPP during 2011-12. In absolute terms, India’s national R&D expenditure during 2011-12 has been estimated to be of the order of Rs.72620.44 crore.

India invested 0.88% of its Gross Domestic Product (GDP) towards Research and Development (R&D) whereas USA and South Korea spent 2.76% and 4.04% respectively during 2011-12. However, the private sector contribution in R&D as percentage of GDP in India is only one-third while two-third is being contributed by the public sector. The private sector participation in India’s R&D has not kept pace with many developed and emerging countries in the world.

The Government has desired to invest 2% of its GDP on R&D during the XII plan period and has taken various measures for the promotion and growth of scientific research in the country. These measures include successive increase in plan allocations for Scientific Departments, setting up of new institutions for science education and research, launching of New Science, Technology and Innovation Policy 2013, creation of centres of excellence for research and facilities in emerging and frontline S&T areas in academic and national institutes, establishment of new and attractive fellowships, strengthening infrastructure for Research and Development (R&D) in universities, encouraging public-private R&D partnerships, recognition of R&D units, fiscal incentives and support measures for enhancing the participation of industry in R&D. 

There will be no dilution of MGNREGA, Says Birender Singh


Union Minister for Rural Development Shri Birender Singh has reiterated that there will be no dilution of MGNREGA and the rural job scheme will continue to remain as one of the flagship schemes of the NDA Government. Replying to a Calling Attention Motion in the Rajya Sabha on the reported move of the Government to introduce changes in the MGNREGs by reducing the wage component of the fund allocation and restricting the areas of work, the Minister emphasised that the rural job scheme will remain operational in all the 6,500 Blocks and will not be restricted to 2,500 Blocks as being alleged by some of the members. Shri Birender Singh also made it clear that the wage-material ratio of 60:40 will never be allowed to cross and informed the members that during the last 8 years around Rs. 1,80,000 crores have been paid as wages to the workers, which is around 71% of the total expenditure made till date. Besides, in order to have adequate number of technical assistants on the ground to supervise and ensure the creation of quality assets, the Ministry has allowed the States for payment of remuneration of technical assistants/barefoot engineers from the skilled wage (material) component of the work. Moreover, the wage material ratio for works taken up by agencies other than Gram Panchayats would now be counted at the district level (instead of block level) to facilitate taking up more durable assets. He said, 21 States have formulated their State Convergence Plans in consultation with various line departments in this regard.

Allaying the apprehensions of the members regarding budgetary cuts, Shri Birender Singh said, the budget provision under the MGNREGS in 2013-14 was Rs. 33000 crores, while in the current financial year 2014-15 the budget provision is Rs. 34000 crores, so there is no question of any financial pruning as far as the rural job scheme is concerned. He also added that this Act has ensured considerable financial inclusion with around 9.76 crore accounts of MGNREGA workers being in Banks and Post Offices.

The Minister said, over the last eight years of its implementation, MGNREGA has achieved significant results. On an average around 5 crore households, which is close to 29% of the total rural households, are provided employment under the scheme every year. Around 54% of MGNREGA workers are women and close to 40% are SCs & STs. Shri Birender Singh said, as per recent Performance Audit conducted by the C&AG, around 90% of the beneficiaries were either casual labourers or small or marginal farmers. It is also an important source of income for families susceptible to distress migration in view of limited work opportunities.
 
Safe Drinking Water to all Rural Habitations by 2022-Birender Singh.
The Government today said that providing safe drinking water facilities to all the rural people of the country is its topmost priority and the mission will be accomplished in the next 8 years. Replying to a question in the Lok Sabha, the Union Minister of Rural Development and Drinking Water and Sanitation Sh Birender Singh said that 17 lakh habitations will be provided with drinking water facilities by 2022. He said, the main goal of the NDA Government is to ensure that every rural Indian will have access to sufficient water for drinking and cooking purposes, besides catering to the demands of the livestock.

The Minister said that 78,000 villages in the country face the serious problem of water contamination like fluoride , arsenic and other heavy metals and the priority of the government is to tackle the menace on war footing. A committee of the Secretaries is also looking into this issue and will soon come out with practical and implementable solutions.

On the concern raised by a Member from Punjab regarding polluted water leading to cancer, the Minister pointed out that State Governments are free to utilise 67 percent of the budget allocated to tackle such problems of contamination. He also added that 10 percent of budget could also be utilized for any exigency including deficient monsoon. Sh Birender Singh also informed the members that in some of the cases, State Governments don’t come forward to take the funds allocated, besides keeping the unspent balance for long. 

Committee on Restructuring of Railways


Ministry of Railways have constituted a committee on 22.09.2014 with a tenure of one year for “Mobilization of resources for major Railway projects and Re-structuring of Railways, Ministry & Railway Board” under the chairmanship of Dr. Bibek Debroy. The terms of reference of the committee are:

1. Re-organising and re-structuring the Board and subsequently the department so that policy making and operations are separated, the department does not work in silos, policy making focuses on long term and medium term planning issues and operations focuses on day to day functioning of the organisation.

2. Promote exchange of officers between the Railways and other departments.

3. Estimate financial needs of the Railways and ensure appropriate frameworks and policies are in place to raise resources, both internally and from outside the Government, to enable Railways to meet the demands of the future.

4. Examine and suggest modalities for implementing the existing Cabinet decisions on setting up a Rail Tariff Authority and give recommendations.

The committee has been interacting with a cross section of Railwaymen including Railway Unions and other stakeholders and suitable action on the recommendations can be considered on submission of the report of the committee. 



            The Ministry of New & Renewable Energy has initiated scheme for setting up of 25 Solar Parks, each with the capacity of 500 MW and above, to be developed in next 5 years in various States. The Ministry has sent scheme for Development of Solar Park to various States along with MOU to all the state Governments against which 12 states have given consent for setting up of Solar Parks. This was stated by Sh. Piyush Goyal, Minister of state for Power, Coal & New and Renewable Energy (Independent Charge) in a written reply to a question in the Lok Sabha today.

   States which have sent written request for setting up Solar Power Park/Ultra Mega Solar Power Projects are given below:-  


S. No.
State
Capacity of Solar Park (approximately
Land Identified at
1
Gujarat
750 MW
Taluka- Vav, Distt.-Banaskantha
2
Madhya Pradesh
750 MW +750 MW
Rewa-Distt.
3
Telangana
1000 MW
Mehboob Nagar-Distt.
4
Andhra Pradesh
2500 MW
Anantpur-Distt, Kadapa and Kurnool
5
Karnataka
1000 MW
Mulwar, Bijapur (near Kargi)
6
Uttar Pradesh
600 MW
District-Jalaun, Sonbhadra and
Allahabad
7
Meghalaya
50 MW
University of Science and Technology, 9thMile, near Guwahati, Meghalaya
8
Jammu & Kashmir
7500 MW
Leh and Kargil
9
Punjab
1000 MW +1000 MW
District-wise land identified
10
Rajasthan
i.        Bhadla Phase-II
ii.      Bhadla Phase-III
iii.    Jaisalmer Park Phase-I
iv.     Jaisalmer Park Phase-II

700 MW
1000 MW
1000 MW
1000 MW

District - Bhadla and Jaisalmer
11
Tamil Nadu
500 MW
Location yet to be identified
12
Odisha
1000 MW
Location yet to be identified

Total
22,100 MW


            The Minister further stated that the estimated cost for development of solar park would be around Rs.0.95 Cr./MW.  Solar Power Plants of various capacities would be set up by Solar Power Developers in the Park.  The developers would be selected through bidding process under Central/State Schemes.  As per tariff determined for the year 2014-15 by Central Electricity Regulatory Commission 

Steps to Overcome the Shortcomings in Supply of Power


The Central Government is taking the following steps to overcome the shortcomings in supply of power.

(i) Generation capacity addition of 88,537 MW is targeted for the 12th Plan from conventional sources. As against this, 48,026 MW has already been achieved.

(ii) Transmission lines of 1,07,440 ckm and 2,82,740 MVA transformation capacity have been targeted for the 12th Plan. As against this, 45,570 ckm of transmission lines and 1,56,354 MVA of transformation capacity has been achieved.

(iii) Two new schemes have been approved by the Government, namely Deendayal Upadhyaya Gram Jyoti Yojna and Integrated Power Development Scheme for strengthening of sub-transmission and distribution networks and for segregation of agricultural feeders.

(iv) Government of India has taken initiative to prepare Action Plans for providing 24x7 Power For All (PFA) in partnership with the States.

(v) Renovation & Modernization (R&M) of old power plants is planned by the concerned State and Central Power Utilities for improving the Plant Load Factor of power stations.

(vi) The gap in coal availability is planned to be met through enhanced coal production and coal imports for increased generation by thermal plants.

(vii) Promotion of energy conservation, energy efficiency and demand side management measures.

(viii) In order to support financial viability of State Distribution Utilities (Discoms), the Central Government had notified a Financial Restructuring Plan (FRP). (ix) Expeditious resolution of issues relating to environmental and forest clearances.

The availability of power both in terms of energy and peak in the country during the current year 2014-15 (up to October, 2014) is 617.7 BU and 1,41,160 MW respectively. This was stated by Sh. Piyush Goyal, Minister of state for Power, Coal & New and Renewable Energy (Independent Charge) in a written reply to a question in the Lok Sabha today.

The Minister further stated that the assessment of anticipated shortage of power in the current year 2014-15 has been done and as per the assessment, the anticipated shortage of power in terms of energy and peak during the year would be 5.1% and 2.0% respectively. 
Round the Clock Supply of Power
Government of India has taken a joint initiative with respective State Governments to provide 24 x 7 power to the non-agricultural consumers while ensuring sufficient supply to agricultural consumers. This initiative aims at ensuring uninterrupted power supply to the existing consumers and providing access to electricity to all un-connected consumers in the next five years. To begin with, state specific documents for Andhra Pradesh and Rajasthan have been prepared in consultation with respective State Governments. This was stated by Sh. Piyush Goyal, Minister of state for Power, Coal & New and Renewable Energy (Independent Charge) in a written reply to a question in the Lok Sabha today.

The Minister further stated that the following steps have been taken by the Union Government to increase the power generation capacity and to ensure round the clock power supply in the whole country:

(i) Government of India has now launched two new schemes viz. Deendayal Upadhyaya Gram Jyoti Yojana (DDUGJY) & Integrated Power Development Scheme (IPDS). The first, aims to provide reliable and adequate power supply to farmers by separation of agriculture and non-agriculture feeders and strengthening of sub-transmission and distribution infrastructure in rural areas, among others. Rajiv Gandhi Grameen Vidyutikaran Yojana for rural electrification will get subsumed in DDUGJY. The second scheme, Integrated Power Development Scheme (IPDS), aims to reduce AT &C losses and also to provide quality power by strengthening sub-transmission and distribution network in urban areas. RAPDRP will get subsumed in IPDS.

(ii) A capacity addition target of 88,537 MW has been fixed for the 12th Plan period, comprising 72,340 MW from Thermal, 10,897 MW from Hydro and 5,300 MW for Nuclear. The achievement against this target, as on 31.10.2014, is 48,026.3 MW, comprising 46199.9 MW from thermal and 1,826.4 MW from Hydro.

(iii) Central Electricity Authority (CEA) is monitoring the progress of construction of power projects through frequent site visits and interaction with the developers and equipment suppliers. In addition, CEA holds review meetings periodically with the developers and other stakeholders to identify issues critical to commissioning of projects and helps in resolving them.

(iv) A Power Project Monitoring Panel (PPMP) has been set up by the Ministry of Power for independent monitoring of Thermal and Hydro Generation projects targeted for commissioning during the 12th Plan and beyond along with the associated transmission systems. 

Featured post

UKPCS2012 FINAL RESULT SAMVEG IAS DEHRADUN

    Heartfelt congratulations to all my dear student .this was outstanding performance .this was possible due to ...